Four independent practices · Free or fixed-fee · No development commitment
Bcal Energy · Practices
Four ways to start small.
A site qualification in 60 seconds. A fixed-fee diligence package in about two weeks. A standalone incentive engagement. A free weekly intel newsletter. Each one independent — each one a way to test how we think before any development engagement.
01
$7,500about two weeks
Preliminary Feasibility Study
Site-specific Preliminary Feasibility Study — the speed-to-power screen. Whether new or expanded firm capacity pencils at your meter past PG&E's multi-year interconnection queue: tariff context, the queue picture, post-OBBBA ITC sizing, air-district screen, and a one-page indicative (modeled) economics summary. The entry rung — the full ownership / behind-the-meter feasibility study is $25,000 fixed.
Standalone advisory for the California and federal incentive stack — the flat 30% ITC, biogas RIN treatment, CPUC interconnection sequencing, and what remains after SGIP's generation budget closed. No development commitment required.
Drop a site address into qualify.bcalenergy.com and get a same-day PDF with PG&E ICA hosting capacity, indicative ITC sizing, and an air-district verdict. No sales call required.
Past these four, the full development engagement is by direct conversation only — every site is bespoke.See how we develop →
Closer · Or skip the menu
If a full engagement is what you need — just write.
A 20-minute conversation is all it takes to see whether your site fits — the site-specific screen itself is the fixed-fee Preliminary Feasibility Study. No development commitment, no broker fee.